You can't be on every site. Gestora is.
The execution risk you can't see is the margin you've already lost.
Gestora listens to the chat your crews already use, turns every problem into an owned issue, and keeps a live grade on each project's health.
Every day of invisible field activity quietly erodes project margin.
The crew on site today already knows what next month's numbers are going to say. The office finds out from the financials — after the money is spent. None of the figures below are surprises. All of them are invisible until it's too late to act.
The information that prevents this lives in the field — and today it never reaches the people who could act on it in time.
From field chat to an owned, graded operation.
No new behavior to teach. Crews keep talking the way they already do — Gestora does the structuring, the routing, and the grading in the background, in real time.
Listen
Gestora reads the field chat your crews already use — voice, photo, or text.
Understand
It picks out what matters — a blocker, a risk, materials, safety, progress — and opens an issue.
Assign
Every issue gets an owner automatically, matched by role and what it's about. No manager triage.
Grade
Each project gets a live health grade, A to F, from how the work is actually going.
You just see it
Open the dashboard to the projects that need you. Step in only where it counts.
It speaks construction, not generic software.
Gestora reads every report against the categories that actually matter on an industrial site — so what surfaces is your operation, in your language, and the health grade is built from the things your teams already care about. These are the ten it's tuned for today.
Execution
General work activity and on-site progress.
Resources
Materials, consumables, tools, labor availability.
Equipment
Machinery failures, downtime, maintenance.
Safety
HSE events and sensitive field conditions.
Coordination
Dependencies, sequencing, alignment gaps.
Quality
QC failures, inspections, rework.
Team
Crew dynamics and communication on site.
Commercial
Billing milestones, client approvals, contract.
Environmental
Weather, terrain, access road conditions.
Engineering
Drawings, RFIs, spec and procedure approvals.
Every project gets a live grade.
The grade isn't assigned by a person — Gestora computes it from how the work is actually going in the field, and keeps it current as reports come in. Open any grade to see exactly what's pulling it down, and the one thing to fix first.
Can we trust the data?
Enough of the crew reporting, with enough detail to mean something. Without that, Gestora says so rather than guessing.
What's pulling it down?
The pressure on execution right now — open problems, anything touching safety, issues that keep coming back, and whether the team is actually moving on them.
Is there momentum?
Is the field active today, or has the channel gone quiet — the earliest sign a site is drifting.
Know which site needs you today — not at month-end.
Whether you run three projects or thirty, every one rolls up into a single view — graded, ranked worst-first, every issue already routed to an owner. Your attention goes to the sites that need it this week, not the ones that look fine in the weekly report.
Portfolio
3 projects · sorted by statusRun more projects, not more triage.
The moment a worker reports a problem, Gestora opens an issue and routes it to the right owner — matched by role and what the issue is about. You stop being the bottleneck for what the field knows. Add the tenth project; the routing never lands on your desk.
Safety can't wait for the weekly meeting.
The near-miss that matters is the one nobody writes up. Because reports to Gestora are anonymous, crews actually surface them — and when one is escalated, Gestora makes sure it lands on the right person in minutes.
Every observation is captured
Near-misses and unsafe conditions come in from the field as they happen — not reconstructed after an incident.
Escalations route instantly
Escalate one and Gestora assigns it to your safety (HSE) owner and notifies the project director immediately.
Anonymous by design
Gestora tracks who reported, never what. That's why the hidden hazards actually surface.
A record you can stand behind
A continuous, time-stamped safety log that strengthens your insurance standing and bid prequalification over time.
An intelligence layer — not another system to replace.
We live alongside your systems. We don't replace them.
Your accounting and project tools are excellent at what they're built for. They just don't turn daily field activity into something you can act on — because that activity has never been structured anywhere. Gestora adds exactly that layer, on top of the systems you already run.
The third era of field operations.
Every decade, the lever has moved. This is the decade the field becomes visible — for the operators who keep delivering.
Paper era
Daily reports for compliance and claims. Information stayed on the jobsite, archived in a binder, surfaced only when something went wrong.
Mobile · forms era
Tablets and apps captured more data — but workers had to do extra work to feed them. Adoption plateaued; the picture stayed thin.
Conversational intelligence
Chat-native capture removes the work. The field becomes operational intelligence in real time. This is Gestora.

Pilot one project. See it for yourself.
Start with one active project. Crews are live in week one — no app to download — and within two weeks you're seeing it graded, with every issue already routed to an owner.